01 / Modular colocation

Tier III, built in a factory.

A complete 400 kW Tier III data centre packaged into three insulated steel modules. Twenty 20 kW racks, dual UPS, eighteen in-row cooling units, hot-aisle containment, integrated fire detection and suppression, all assembled, witness-tested, and commissioned at the factory before being trucked to site. Civil works run in parallel; capacity lands when the trailer arrives.

01 / THE MODULE

The 400 kW MDC.

Three insulated steel enclosures combine into one Tier III data centre: two IT rooms hosting twenty 20 kW racks plus a dedicated power-and-cooling room. Witness-tested at the factory before shipping.

  • FORM3 × steel modules
  • CAPACITY400 kW · N+N
  • RACKS20 × 42U @ 20 kW
  • LEAD TIME~6 mo
Tier III EI60 · 80 mm Hot-aisle contained
02 / THE RACK

20 kW, 42U.

An EIA-310-D cabinet with 70% perforated front and split rear doors that open 130° for service. Tool-less doors, removable power trough, and a removable bottom cover for raised-floor cabling. Frame rated to 1,420 kg, IP20.

  • FORM42U · 600 × 1100 × 2000 mm
  • POWER20 kW · A+B feeds
  • STANDARDEIA-310-D · IP20
  • LOAD1,420 kg max
70% perforation Tool-less doors Raised floor ready
03 / THE DCIM

One pane of glass.

A real-time platform spanning every rack and site: live PUE and energy analytics, rack-level asset and capacity views, ITIL-aligned incident and work-order flow, plus a mobile inspection app with QR-coded assets.

  • VIEWSingle pane · multi-site
  • METRICSLive + historical PUE
  • MODULESAsset · Capacity · Work order
  • ACCESSWeb + mobile app
Live PUE Asset graph ITIL incident flow
Inside the module

Nine systems already inside.

Every Tier III pod arrives commissioned and factory-tested. These are the systems wired up when the trailer lands.

01 / N+N POWER

Dual-fed by default.

Details

Two 1,600 A main distribution boards with automatic transfer, two 500 kVA UPS systems, and vertical PDUs. Every rack gets independent A and B feeds.

02 / N+1 COOLING

PUE 1.29 verified.

Details

Eighteen in-row DX units with paired outdoor condensers, hot-aisle containment, and a dedicated electrical-room split. Validated against Nairobi's 20-year ASHRAE profile at 400 kW.

03 / CARRIER-NEUTRAL

Dual fibre entry.

Details

Multiple terrestrial and submarine carriers terminating into a meet-me room. Cross-connects on request, no lock-in.

04 / FACTORY-BUILT

Witness-tested before shipping.

Details

Modules are wired, plumbed, and commissioned off-site, then witness-tested. Civil works run in parallel; capacity lands when the trailer arrives.

05 / FIRE & SAFETY

EI60 throughout.

Details

Insulated 80 mm steel panels, 60-minute fire rating, EI60-rated doors, integrated detection, and clean-agent suppression. Aspirating smoke detection optional.

06 / SECURITY-READY

Access & surveillance built in.

Details

PoE-managed access control on EI60 doors, full IP CCTV with NVR, and a managed PoE switch. Wired, mounted, and configured at the factory.

07 / SOVEREIGN

Built where you operate.

Details

Sites placed where energy, fibre, and regulatory clarity converge. Operated by local teams under local jurisdiction, monitored from your DCIM.

08 / ALTITUDE READY

1,624 m · 6-34 °C.

Details

Performance verified at Nairobi altitude across the full annual temperature band. Efficiency holds where most reference designs degrade.

09 / ECONOMICS

~$7M / MW · ~6 months.

Details

A complete Tier III megawatt at a fraction of a ground-up build's cost. Time-to-deploy compressed from 18-36 months to about six. Every decision sized for compute per watt and per dollar.

Where it lands

See a live site: Hell's Gate.

Our flagship deployment sits inside the Hell's Gate deep tech park, powered by Kenyan geothermal. It is the clearest picture of what modular colocation looks like on the ground.