Data centres, power and networks are becoming a public argument in Africa. Much of that argument is imported, and it does not describe what is happening here. This is a plain record of the numbers: what the infrastructure costs, what it does not cost, and who it serves.

0.4 GWData centre capacity, all of Africa
Under 1%Africa’s share of the world’s compute
~70%Of its internet traffic leaves the continent
600MPeople here with no electricity at all
Why this exists

A debate arrived before the buildings did.

In the United States the fight over data centres is a fight about abundance. Those communities already have the power, the water and the connectivity, and are deciding how much more to give away. Africa is not in that position. Same subject, different argument.

The starting point

Eighteen percent of the people.
Under one percent of the compute.

Africa is not deciding whether to add capacity to a system that already has plenty. It is deciding whether to have the system.

18%
Of the world’s people
Ten blocks of 100. One thousand in all.
Under 1%
Of the world’s compute
Ten blocks of 100. One thousand in all.
0.4 GWBuilt, all of Africa
1.5 to 2.2 GW
Needed by 2030

Capacity today against demand in 2030 · McKinsey, November 2025

What it is for

What a building full
of computers is for.

Four things change when the capacity is local.

01 / Distance

An email across town, routed through Frankfurt.

Storing data in Europe sends every request ten thousand kilometres and back. Nigeria's exchange point more than doubled domestic traffic in eleven months once local hosting arrived.

02 / Currency

Hosting bought abroad is paid for in dollars.

Nigeria's offshore hosting bill runs at about $850 million a year, with roughly 70 percent of government agencies keeping data outside the country.

03 / Research

Ninety-five in a hundred are waiting.

Only 5 percent of Africa's AI researchers can reliably get the compute they need, and only 1 percent have GPUs in their own building.

04 / Jurisdiction

Data protection ends at the border.

Thirty-six of 54 African countries now have data protection law. None of it reaches far while the servers holding citizens' records sit in another country's courts.

Fact or fiction

The six objections
we hear most.

Some are true and some are not, and the honest answer is not always the one that suits us.

1 of 6

True or false?

Data centres will take electricity that households need.

Answer to see the evidence
Read all six as plain text

01 · Data centres will take electricity that households need.

Half right. Around 600 million Africans have no electricity, more than 80 percent of the global gap. Data centres did not cause that and refusing them will not close it. What matters is whether a facility adds generation or only draws from it. Kenya gets over 90 percent of its power from renewables and passed 1,000 MW of installed geothermal in March 2026, which is the kind of grid that can carry this load without taking from anyone. Its entire data centre load is about 40 MW today, against a grid measured in thousands.

The standard we hold to. Arrive with contracted, additional generation, and pay as an anchor customer that makes new supply financeable. The real risk runs the other way: private captive power that bypasses the utility and leaves the grid no better off.

02 · They drink water that communities need.

A fair concern. Evaporative cooling uses roughly 25 million litres per megawatt a year and loses 80 percent of it to the air. In August 2026 civil society groups called for an inquiry into a proposed 174 MW campus near Cape Town on those grounds. The objection is reasonable. But evaporative cooling is a choice. Closed-loop and air-cooled designs use almost no water, at the cost of a little more electricity.

The standard we hold to. Closed loop wherever water is stressed, with the figure published yearly and open to audit. An operator who will not publish it should not get the site.

03 · They create almost no jobs.

Largely true. A colocation site supports three to six direct jobs per megawatt. A 100 MW build is about 500 construction jobs and 50 permanent roles. Anyone promising a factory’s worth of employment is selling something. The case sits downstream, in what can only run on capacity people can reach, and in a technical trade Africa currently imports.

The standard we hold to. Publish real headcount, construction and permanent, counted separately. Hire and certify locally instead of flying crews in.

04 · They take land that should be used for something else.

Not the real constraint. Data centres have one of the smallest footprints in heavy infrastructure. McKinsey expects two thirds of new African capacity at 1 to 50 MW, not the 500 MW campuses of Virginia and Texas. Those fit inside industrial zones on a few hectares. What binds here is proximity to firm power and fibre.

The standard we hold to. Build inside existing industrial and energy zones. Publish the site plan before construction, not after, and hold a session where people can read it.

05 · It is all built for foreign companies anyway.

True so far. The largest facilities here were financed to serve global cloud platforms, and much of the value flows straight back out. That is an objection about ownership, not about whether the infrastructure should exist. And 36 of 54 African countries now have data protection law, which counts for little while the servers sit under another country’s jurisdiction.

The standard we hold to. Local ownership and local tax residence. A published share of capacity for universities, public research and local startups at prices they can pay. No exclusivity that outlasts the hardware.

06 · You cannot live next to one. The noise is constant.

Easily designed out. A data centre reads 40 to 59 decibels at the boundary. A library is 30, a conversation 60, and hearing damage starts at 85. The noise comes from cooling and from backup generators, and generators idle almost always, running about 30 minutes a month for testing. In Northern Virginia, the densest cluster anywhere, they account for under 4 percent of regional nitrogen oxides. Setbacks, acoustic walls and tree lines work, because sound falls off with distance.

The standard we hold to. A sound study before construction and after commissioning, both published. A boundary limit in the permit, and a named person a neighbour can call when it is breached.

The evidence

Power, water, land,
noise and jobs.

Where a figure is American we say so, and we say what carries across.

Kenya’s entire data centre load is 40 MW.

Kenya runs on more than 90 percent renewables and passed 1,000 MW of installed geothermal in March 2026. Its entire data centre load is about 40 MW today and is forecast near 155 MW by 2029, against a national grid measured in thousands of megawatts. The gap that matters is the 600 million people with no supply at all, and no data centre caused it.

Kenya data centre IT load · African Energy Chamber, 2026

The standard we hold to

Contracted, additional generation, and an anchor customer that makes new supply financeable. The real risk runs the other way: private captive power that bypasses the utility and leaves the grid no better off.

The water and land comparisons are American, because the United States has counted more carefully. Decibels, land arithmetic and cooling physics carry across. The catchment a site draws from does not, and has to be answered site by site.

The standard

What we will publish.

What we ask of every operator building here, Navon included. Each one is a number or a document an outsider can check.

01
Power

Bring your own generation.

Contracted and additional, not taken from the queue in front of households. Publish the source and the term.

02
Water

Closed loop where water is scarce.

Publish water use effectiveness annually, in litres, open to audit. Accept the small efficiency penalty.

03
Efficiency

Publish the power number too.

Power use effectiveness on the same schedule, so a site can be compared against its own past and its neighbours.

04
People

Count the jobs honestly.

Construction and permanent roles counted separately. Hire and certify locally, and fund the training.

05
Access

Reserve capacity for research.

A published share of every site kept for universities, public research and local startups, in local currency where the law allows.

06
Disclosure

Publish the plan first.

Publish the plan, the power draw and the water design before construction starts, and take questions on it.

Sources

Where the numbers come from.

Current as of September 2026. Where sources disagree we show the range. If a figure is wrong, out of date, or reads more favourably than the research supports, tell us and we will correct it.

Building data centers for Africa’s unique market dynamics McKinsey & Company, November 2025

Capacity today and to 2030, investment ranges, facility size mix.

Are data centers Africa’s next big bet? Energy for Growth Hub, 2025

Share of global capacity, committed investment, grid and localisation risks.

Anchoring the African internet ecosystem Internet Society

Traffic leaving the continent, latency before and after local exchange points.

Nigeria’s $850m foreign cloud bet leaves fintechs exposed to global shocks BusinessDay Nigeria, 2026

Annual offshore hosting spend, share of government agencies hosting abroad.

Groups urge inquiry into data centres’ water use Business Day South Africa, August 2026

Evaporative cooling water intensity, the Cape Town objection.

Continental Artificial Intelligence Strategy African Union, July 2024

Continental policy position, phased implementation from 2025 to 2030.

2024 United States data center energy usage report Lawrence Berkeley National Laboratory, 2024

US data centre water consumption, the 17.4 billion gallon figure.

Data centers in Virginia, report 598 Joint Legislative Audit and Review Commission, 2024

Boundary noise levels, generator run hours, generator share of regional emissions.

Get involved

Tell us where
we are wrong.

Regulators, utilities, universities, community groups: if you have a question about a project near you, we would rather answer it than read about it later. If you have better data, send it.